The new look for Geneva Airport has been unveiled.
The current building was designed in 1968 and it will be obsolete by 2040 - so a major redesign is needed.
The check-in area will be expanded, security moved to a new building, the train line will be on the surface and the shopping mall will be redeveloped.
Work will start in two years and the first stage will last until 2032.
Switzerland slammed for denying pregnant prisoner visit from the father
Greens continue fight against federal councillor
Birth rate lifts in Geneva - slightly
New fibre optic cable under the lake
Storms unveil 1970s air crash wreckage
Total fire ban in many cantons
