Trains between Geneva and Lausanne restart

Trains have restarted along the damaged track near Tolochenaz. But it’s likely speed restrictions will be in place for the next two weeks.

Today the limit will be just 20 kph – but that will gradually be increased as engineers asses how the ground reacts. 

The limits mean there will be fewer trains - only 4 in each direction every hour instead of six. 

This week’s disruption – which effectively cut Geneva off from the rest of the country – has given new impetus for upgrading the line. 

Two ministers from Vaud and Geneva, Nuria Gorrite and Serge Dal Busco, are united on calling for a new line to be built by 2050. 

More from Bitesize News

  • Annecy mayor visits local school

    Antoine Armand, elected mayor of Annecy in March, has made his first back-to-school visit as head of the cross-border city, meeting pupils and teachers at Cran-Gevrier's Vernay school on Tuesday morning

  • Climate change affecting rainfall patterns

    Rain in Switzerland is falling less often but more heavily when it does, and the trend is likely to continue, according to MeteoSwiss

  • More security checks after Aarau shooting

    Every big public event is likely to face tighter security after the fatal Aarau festival shooting, according to former national security chief André Duvillard

  • Swiss Life job losses

    Zurich-based insurer Swiss Life will cut around 600 jobs by the end of 2028, with half of them in Switzerland

  • Crans Montana bar missed crucial checks

    The security officer for Chermignon has told Valais prosecutors that no proper inspection of the Constellation bar ever took place before it opened in December 2015

  • Fire cause revealed

    Authorities now believe a lithium battery may have triggered Friday's warehouse fire at the Thévenaz-Leduc recycling site in Ecublens, though the cause has not yet been formally confirmed

Download our app

  • Available on the App Store
  • Available on Google Play