10 km tailbacks at Gotthard yesterday

It wasn’t unexpected – major tailbacks at the southern end of the Gotthard Tunnel formed yesterday afternoon and into the evening.

Queues peaked at ten kilometres – leading to delay of around two hours for those returning home.  

But it wasn’t just the end of the Easter break – the tunnel was busy throughout the holiday period. 

There were jams over the weekend as well. 

The havoc has again raised the debate about crossing the Alps. Many ask if charging a toll would be a good idea to limit traffic – and some stuck in the lines told the press that non-Swiss cars should be charged more.

More from Bitesize News

  • SBB reports increase in incidents

    Staff on Switzerland's rail network face around ten incidents of abuse or threat every working day, with insults, racist comments and physical attacks all on the rise since the pandemic

  • Households feeling the financial strain

    Even middle-class Swiss households say they are struggling to make ends meet, with 89% of Swiss now tracking spending every month

  • Conference underway in Geneva

    The Building Bridges conference has opened in Geneva, bringing finance houses, NGOs, companies and academics together for three days on climate and sustainability

  • More student violence in France

    Police fired tear gas yesterday at student demonstrators outside Lycée Monge in Chambéry, as the lycée protests that shut Haute-Savoie schools last week spread into neighbouring Savoie

  • Health insurance premiums only rising

    Swiss basic health premiums could pass CHF 1,000.- a month within 15 years if the current rate of increase holds

  • Borrowing costs increase

    Switzerland is being pulled into a global surge in borrowing costs

Download our app

  • Available on the App Store
  • Available on Google Play