The new look for Geneva Airport has been unveiled.
The current building was designed in 1968 and it will be obsolete by 2040 - so a major redesign is needed.
The check-in area will be expanded, security moved to a new building, the train line will be on the surface and the shopping mall will be redeveloped.
Work will start in two years and the first stage will last until 2032.
Measles is a threat
Switzerland battles cyber attacks constantly
Fire memorial tent burns down
Zurich has some of the worst traffic in Europe
Switzerland takes first gold - but still a surprise
Court backs school ban for non-residents
